Shocker, there are rocks everywhere here, this one came out
of the 6 foot deep trentch that the water and electric run
through (220 feet from the house to the barn)
Barn supplies backing up the driveway
Moving the building supplies from the truck to the front pasture
One day down, most of the exterior framing is done
At the end of day two they had the framing completed
Half a roof and some interior details
(stalls started) at the end of day three
After 5 days, the interior is nearly complete,
some finish work needed
Melisa checking out the stalls
Major construction is done, some interior finsh work
is needed at this point, and grading of earth in
and around the barn prior to pouring concrete
The view from the back, the pastures are to the
right, the house is straight through the barn.